Bally Walk-In Assembly

 

Five easy steps to assemble a Bally walk-in...      
Bally's Joining System--strong and versatile


Five easy steps to assemble a Bally walk-in... 

1.  Position floor panels.  Use Speed-loks to connect the panels.  A level building floor is necessary.

2.  Start assembling walls by joining a wall panel to a corner panel.  Lock both panels to the floor.  Each vertical panel contains at least four Speed-loks.  Because locks are actuated from the inside, walk-ins can be installed close to existing walls.

3.  Finish assembling walls by locking together remaining vertical panels.  Install the fourth corner panel last.

4.  Begin assembling the ceiling by locking the end ceiling to the side walls.

5.  Complete the ceiling assembly by locking the remaining ceiling panels together and, in turn, to side walls.

Bally's Diaphragmatic Joining System is Strong and Versatile

The Bally Speed-lok, consisting of only two simple assemblies, is operated by a single tool:  a hex wrench.

1.  The Locking Pin is a steel rod precisely positioned so that the locking arm engages it tightly.

2.  The Locking Arm is cam-mounted with a hooked end.  When a hex wrench is used to turn the arm, the  movement of the cam first enables the hook to engage the pin and then draws the panels tightly together. 


The heart of a rugged, versatile walk-in is its joining system.  Bally's diaphragmatic system--based on our superb Speed-lok--is proven effective in more than 150,000 installations worldwide.  Bolstered by a steel strap foamed into the panels, Bally structures are unusually strong and versatile.

 