1.
Position floor panels. Use Speed-loks
to connect the panels. A level building
floor is necessary.
2.
Start assembling walls by joining a wall panel
to a corner panel. Lock both panels to
the floor. Each vertical panel contains
at least four Speed-loks. Because locks
are actuated from the inside, walk-ins can be
installed close to existing walls.
3.
Finish assembling walls by locking together
remaining vertical panels. Install the
fourth corner panel last.
4.
Begin assembling the ceiling by locking the
end ceiling to the side walls.
5.
Complete the ceiling assembly by locking the
remaining ceiling panels together and, in turn,
to side walls. |